Low Pressure Production Phase​
The Sleipner area embraces the gas and condensate fields Sleipner Øst, Gungne and Sleipner Vest. Sleipner Vest is a field in the central part of the North Sea infrastructure and was discovered in 1974.

Client

Equinor

Project

Sleipner Low Pressure Produduction

Scope

Business Planning (A-C Study)​

Date

2022-2023​

The field is developed with the Sleipner B production/wellhead facility, which is remotely operated from the Sleipner A facility on the Sleipner Øst field. Production started in 1996.​

Equinor are studying the necessary modifications required for the Sleipner platforms to cover the production needs for Sleipner Vest in the period 2024-2027. Sleipner LPP and the consolidation project seek to facilitate increased production, reduced CO2 emissions and reduced operating costs towards the year 2037.​