Equinor FLX decided to carry out a waste heat recovery project and replace exhaust ducts on Statfjord B. The project will reduce carbon dioxide emissions by 20,000 tonnes annually. With a simplified study/installation model, OneTeam managed to reduce total project execution (DG0-Completion).
The project includes engineering, procurement and installation of a waste heat recovery unit (WHRU) replacement of collectors, transition piece and exhaust ducts on gas turbines. Demolish and Install new heating medium piping, valves and tie-in to new installed waste heat recovery unit